Boulder, Colorado

Apex

Turning a fragmented campus into a space of connection, exploration, and belonging

Boulder Valley School District transformed its aging technical education campus into Apex, an open, hands-on learning environment that meets a growing demand for career pathways. The renovation and addition unites previously separated programs and advances the school’s mission to provide real-world learning experiences through collaboration, personalized instruction, and creative problem solving.

Originally constructed as two separate buildings in 1964, the campus had accumulated decades of additions and renovations. Dark corridors, separate entrances, and scattered programs made navigation difficult and reinforced divisions among students. When an opportunity for expansion arose, the district partnered with Cuningham and FCI Constructors to increase capacity from 12 to 17 career pathways and address priorities identified by district leaders, educators, and students.

These priorities, which included more daylight, visible learning, quieter gathering areas, and a stronger campus identity shaped the new, more connected campus. At the center of the design is a multi-level commons and open flex areas that bring students together and extend learning beyond pathway classrooms. Outside, a Scenario Courtyard supports EMT and Criminal Justice simulations, including exercises with a donated ambulance.

  • Client Boulder Valley School District
  • Market Education
  • Services Architecture, Interior Design
  • Scope Renovation, Addition
  • Size 140,000 Square Feet
  • Delivery Method Construction Manager at Risk
  • Key Project Contacts Kari-elin Mock, Jackie Squires
Image
Apex Student Commons
Wood finishes, colorful seating, and clear campus graphics create a warmer, more cohesive environment in place of the dark, disconnected spaces users wanted to leave behind.
Image
Apex construction courtyard
The Scenario Courtyard gives EMT and Criminal Justice students outdoor space for real-world simulations, from investigating crimes to practicing emergency response.

To replace the campus’s dark, disconnected character with places students want to spend time, Cuningham paired daylight with warm wood tones and colorful furnishings that make shared spaces feel welcoming. Large windows and interior glass connect students to the outdoors and increase awareness of activities beyond their own pathways. Within these open spaces, varied seating creates smaller settings for conversation, collaboration, or quieter work. 

Outside, a prominent canopy with integrated solar panels and bold Apex graphics gives the existing brick campus a clear point of arrival, carrying that sense of welcome from the entrance into daily student life.

Image
Apex main entrance dusk
Located on Boulder Valley School District’s Arapahoe Campus, Apex shares the site with several other district programs; illuminated signage and a prominent entrance canopy establish a clear campus identity and make the shared main entrance easier to recognize.

“The spaces do more than modernize the facility; they create an environment where every student can feel valued, included, and supported in discovering and pursuing their next best step or destination. Seeing the vision of the users realized in the finished spaces and the opportunities they create for students is incredibly rewarding.”

Kris Stoppenhagen

Executive Director of Bond Planning and Construction, Boulder Valley School District

By renewing the existing campus, the district extended the value of its buildings while expanding educational opportunity. Apex now pairs specialized career training with shared places for connection, exploration, and belonging—conditions that will remain essential as programs and workforce needs evolve.

Image
Apex nursing classroom
Students practice clinical skills on simulated arms, using classroom equipment to connect instruction with the physical tasks of patient care. 
Image
Apex Behavioral Health
An open glass partition connects the Behavioral Health classroom with an adjacent seating area, giving students and teachers room to extend activities beyond the classroom.

“By bringing students, staff, and designers together, we were able to truly reimagine what career and technical education looks like for our students. The transformation of our spaces has completely shifted how students feel and perform the moment they step into the building.”

Ming Scheid

Principal, Apex

Image
Apex exterior dusk